All ribs are now stitched, and the inspection rings are doped on with their fabric patches. Tomorrow, my IA can inspect the stitches and clear me to put the tapes on.
After that, there's only putting in the drain holes and the seaplane scoops over them, and the left wing is ready to paint.
Lookin good! Hope the inspection goes well! :-)
ReplyDelete